KEBUTUHAN ARMADA OPTIMAL BUS RAPID TRANSIT (BRT) TRANS SEMARANG KORIDOR II (TERMINAL TERBOYO – TERMINAL SISEMUT)

Irin Aerina Wahyu Ramadhan, Reny Yesiana

Abstract

Semarang city as the capital of Central Java Province has a population about 1.729.428 people in 2016 (BPS Semarang, 2017). The population is increasing and the rate of urbanization has impact on the rapid increase in the number of private vehichles and pose a problem like a traffic jam. Bus Rapid Transit (BRT) Trans Semarang is Semarang City government strategy to reduce a traffic jam. Based on data of Trans Semarang passengers, corridor II was the highest number of passengers among other corridors that use medium-sized buses and there is a queue of passengers at transit stop.The study aims to analysis buses optimal required by corridor II to avoid possible over supply. The number of optimal calculated by consider on income operator based on cost namely by counting factors load (load factor) as well as consider operational costs a vehicle (BOK). The method of analysis that used be the method of qualitative and quantitative. Qualitative analysis method used to described a data shaped writing while quantitative to described data numbers or nominal. Data cost for vehicle’s operational obtained from BLU Trans Semarang, then load factor data obtained from the load factor dynamic survey in weekday and weekand at the rush hour on morning and afternoon. Number of optimal can be counted through existing load factor in the break even and number of existing. The survey and data analysis shows corridor II with the total number of 24 unit ready operation have not reached balance. The analysis of the optimal vehicle show that the corridor II requires 26 units of vehicles.

Full Text:

PDF

References

Badan Layanan Umum (BLU) UPTD

Trans Semarang, 2018

Badan Pusat Statistik Kota Semarang. (2017). Kota Semarang Dalam Angka 2017.

Departemen Perhubungan RI. Direktorat Jenderal Perhubungan Darat. (2002). Pedoman Teknis Penyelenggaraan Angkutan Penumpang Umum di Wilayah Perkotaan dalam Trayek Tetap dan Teratur.

Departemen Pekerjaan Umum. (2005). Perhitungan Biaya Operasi Kendaraan Bagian I : Biaya Tidak Tetap (Running Cost).

Junior, N. P. S., Rumayar, A. L. E., & Sendow, T. K. (2016). Analisis Kebutuhan Angkutan Umum Penumpang Kota Manado (Studi Kasus : Paal Dua –Politeknik). Jurnal Sipil Statik, 4(6), 367–373.

Keputusan Menteri Perhubungan Nomor 89 Tahun 2002 tentang Mekanisme Penetapan Tarif dan Formula Perhitungan Biaya Pokok Angkutan Penumpang dengan Mobil, Bus Umum Antar Kota Kelas Ekonomi.

Miro, Fidel. (2012). Pengantar Sistem Transportasi. Jakarta: Erlangga

Ramadhan, Z. (2014). Analisis Perhitungan Dan Perbandingan Biaya Operasional Kendaraan (Bok) Bus Rapid Transit (Brt) Transmusi. Jurnal Teknik Sipil Dan Lingkungan, 2(1), 188–124.

Tamin, O. Z. (2000). Perencanaan & Pemodelan Transportasi.

Refbacks

  • There are currently no refbacks.